Check out osome of our more recent work at Matthew Pearce Public School in Baulkham Hills. This job was a total of 11 independent structures spanning the edges of the entire oval at the school. This mammoth job was approximately 480 square metres and provides water proof access all of the way between the school and and accompanying child care centre. The split level design both maximises coverage and looks aesthetically fantastic. A great job by the whole team on this one!